Before applying for an automated solar plan review and solar permit, projects must follow certain requirements. At this time, SolarAPP+ is designed to provide a code-compliance check for the majority of residential, roof-mounted photovoltaic systems. To see which systems are eligible, please refer to the https://solarapp.nrel.gov/docs/SolarAPP-PV-Eligibility.pdf and Eligibility Checklists. Only projects that conform to this lists are eligible to use the automated SolarAPP+ portal for instant permitting.

- Eligibility to use SolarAPP+
- PV system must be installed on a permitted main dwelling rooftop only (no trenching allowed).
- PV system installations required for Accessory Dwelling Unit (ADU) CEC code compliance may not be submitted as a SolarApp+ application.
- No Ballasted Systems.
- No main panel upgrades may be included with the SolarApp+ application. If a main panel upgrade is needed, please apply for a separate permit.
- NOT located in a City’s flood zone. Please check BOTH the FEMA National Flood Hazard Layer (NFHL) Viewer map AND the City of Roseville Property Information Tool (turn on the “Floodplain” layer).
- Must have preapproval from Roseville Electric (click here for more information) and the following must be met:
- No line side taps. Nothing is to be tied to the Utility side of the main breaker.
- Must be applied for and issued to a California licensed contractor (C-10, C-46, or B classifications only) that has previously registered with SolarAPP+.
- Permit Runners or Expediters are not allowed to submit a SolarAPP+ application.
- Must have a valid CSLB license AND City of Roseville Business License (click here for more information for a business license).
- For a full list of requirements, please click here.
- Submit for Automated Review Through SolarAPP+
- Submit your design to solarapp.nrel.gov .
- Click Login or Register to get started.
- A $25 processing fee will be charged by the SolarAPP+ website.
- Click here for a demonstration on SolarAPP+
- Required Documents
- SolarAPP+ Approval Document
- Specifications
- Plans
- Apply for Permit
- Apply for your permit here.
- Click SolarAPP+ Permit.
- Provide your SolarAPP+ approval ID number and upload your plans, specifications and SolarAPP+ document.
- Pay applicable Building Permit fees (currently $1,349.49).
- Download and print your Building inspection card.
- Getting an Inspection
- Have your Building inspection card printed and available on-site for an inspector.
- Have a one-line diagram on-site for an inspector.
- Click here to schedule an inspection once your project is complete.