The Permit Center is currently offering full in-person services by appointment only Mondays through Fridays from 8:00 am to noon and 1:00 pm to 4:00 pm.  Phone and virtual appointments are still available as an added convenience.  Schedule an In-Person, Phone, or Virtual Appointment or email OPS@roseville.ca.gov for further assistance.

Please follow the below steps:

Step 1:
 Scroll down to find the appropriate checklist for your permit or project
Step 2: Download and complete all forms and gather all documents listed in the checklist as required
Step 3: Review Electronic Plan Review Document Submittal Requirements before submitting plans/maps/technical documents


Already Prepared and Ready to Apply?

Visit the OPS Portal to apply for your permit or project online, or visit the Permit Center to deliver your application packet on a CD/DVD or USB drive. All application packets (including plans, maps, and technical documents) must be submitted in digital format.

Building

0 found in 0 section(s)
  • Building Permit Application - Required only if submitting in-person at the Permit Center. Plans and documents must be provided on a CD/DVD or USB drive.
  • Online Application
  • Carports and Detached Sheds
  • Certificate of Occupancy
  • Commercial Building Addition
  • Commercial Electric Vehicle Service Equipment
  • Commercial Electrical
  • Commercial Foundation Only
  • Commercial HVAC/Mechanical Replacement
  • Commercial Interior Demolition
  • Commercial Photovoltaic
  • Commercial Reroof
  • Commercial Sign
  • Commercial Storage Racks and Shelving
  • Commercial Swimming Pool
  • Commercial Tenant Improvement
  • Fire Aboveground Storage Tank
  • Fire Alarm
  • Fire Hood and Duct System
  • Fire LPG Tank
  • Fire Other Systems
  • Fire Sprinkler
  • Fire Underground Storage Tank
  • Model Home Complex
  • Multi Family Building Addition
  • Multi Family Building Remodel
  • Multi Family Building Single Unit Water Heater or HVAC Change Out
  • New Commercial Building
  • New Multi Family Building
  • Patio Covers and Enclosures
  • Raised Deck
  • Residential Addition
  • Residential Electric Vehicle Service Equipment
  • Residential Electrical
  • Residential HVAC/Mechanical Replacement
  • Residential Master Plan
  • Residential New Accessory Dwelling Unit (ADU)
  • Residential Photovoltaic
  • Residential Plumbing
  • Residential Remodel
  • Residential Reroof
  • Residential Swimming Pools
  • Residential Window Replacement
  • Retaining Wall
  • Single Family Dwelling
  • Single Family Production
  • Temporary Sales Trailer
  • 2022 Mandatory Measures New Lighting
  • 2022 Residential Green Code Checklist
  • 2022 Residential Re Roof CF1R ALT 01 E
  • 2022 Window Replacement CF1R ALT
  • 2025 Code Residential New Lighting Mandatory Measures
  • 2025 Determining water piping and meter sizes
  • 2025 Electric Load Worksheet Revised
  • 2025 Non Residential HVAC Unit Replacement Requirements
  • 2025 Residential Care Facilities Worksheet
  • 2025 Residential Green Code Checklist
  • 2025 Residential Re Roof CF1R ALT 01 E Revised
  • 2025 Window Replacement CF1R ALT
  • 2025 Window Replacement CF2R ALT
  • Accessibility Upgrade Worksheet
  • Air Quality Certificate of Compliance for Residential Construction
  • Air Quality Supplemental Questionnaire for Commercial Construction
  • Bathroom Remodel Requirements
  • Certificate of Occupancy Tenant Building Data
  • Certification of Development Fees
  • Contractor Declarations
  • Determining Water Pipe and Meter Sizes
  • Development Services Concurrent Review Form
  • Electric Load Worksheet
  • Electric Vehicle Service Equipment Permitting and Installation Requirements
  • Electronic Signature Disclosure
  • Foundation Only Permit Agreement
  • Gas Piping Schematic
  • Non Residential HVAC Unit Replacement Requirements
  • Owner Builder Forms
  • Plan Copying Packet
  • Production Plan Check Fee Form
  • Residential Care Facilities Worksheet
  • Roof Mounted Photovoltaic Re Installation Property Owner Acknowledgement
  • Smoke Alarm and Carbon Monoxide Alarm Affidavit
  • Solar Panel Dead Weight Loading Calculation
  • Special Inspection and Testing Agreement
  • Temporary Certificate of Occupancy
  • Unified Program Consolidated (CUPA) Form
  • Verification of Wire Sizes for PV System Calculation Form
  • WELO Landscaping Less Than 2500 SqFt
  • Accessory Dwelling Unit Submittal Requirements
  • Accessory Structure Requirements
  • Building Safety Design Criteria
  • Carports and Detached Shed Requirements
  • Certificate of Occupancy Packet
  • Commercial Electric Vehicle Charging Station Permit Requirements
  • Construction & Demolition Waste Management Plan Resource Guide for Contractors
  • Cool Roof Requirements
  • Exterior Freestanding Concrete Masonry Fireplace and Fire Pit Requirements
  • Fire Sprinklers Letter Template
  • Foundation Only Permit Requirements
  • Gas Fired Residential Water Heaters
  • Gas Piping Information
  • Listed Patio Covers and Enclosures Permit Requirements
  • Master Plan Submittal Requirements
  • Model Home Complex Requirements
  • New Commercial Plan Review Process
  • Non Residential Photovoltaic Packet
  • Notice for Disability Access Laws
  • Patio Cover Permit Requirements
  • Permanent Exterior Gas BBQ Requirements
  • Permit Exemptions
  • Raised Decks and Guardrail Requirements
  • Residential Addition Submittal Requirements
  • Residential Care Facilities Requirements
  • Residential Electric Service Upgrade Process
  • Residential Fire Sprinkler Requirements
  • Residential New Mechanical Unit Requirements
  • Residential Non Electric Solar Panel Permit Requirements
  • Residential Photovoltaic Packet
  • Residential Remodel Submittal Requirements
  • Residential Sewage Ejector Systems
  • Retaining Wall Permit Requirements
  • Single Family Dwelling Submittal Requirements
  • Site Accessibility Plan Requirements
  • Smoke and Carbon Monoxide Alarm Requirements
  • Spa and Hot Tub Requirements
  • Special Inspection Approved Agencies Roster
  • Storage Racks and Shelves Guidelines
  • Swimming Pool Requirements
  • Tankless Water Heater Requirements
  • Temporary Power Pole Requirements
  • Temporary Sales Trailer Requirements
  • Tenant Improvement Requirements
  • Thermal Expansion Tank Requirements for Water Heaters
  • Transportation Systems Management Plan
  • Unpermitted ADU Substandard Conditions Checklist
  • Water Conservation Law
  • What is a Building Permit?
  • Work Performed Without a Permit
  • Water Efficient Landscape Ordinance Checklist
  • 2022 California Residential Code Significant Changes
  • 2022 California Building Code Significant Changes
  • 2022 California Electrical Code Significant Changes
  • 2022 California Energy Code Significant Changes
  • 2022 California Fire Code Significant Changes
  • 2022 California Green Building Standards Significant Code Changes
  • 2022 California Mechanical Code Significant Changes
  • 2022 California Plumbing Code Significant Changes

Planning

0 found in 0 section(s)
  • Ministerial Ten Lot Map Application Form
  • Ministerial Two Lot Map Application Form
  • Objective Design Standards Application Form
  • Street Name Application
  • Universal Application Form
  • Administrative Permit (AP)
  • Administrative Tree Permit (TP)
  • Administrative Variance (AV)
  • Annexation Sphere of Influence
  • Concurrent Review Form
  • Conditional Use Permit Conditional Use Permit Modification
  • Condominium Conversion (Tentative Condominium Map)
  • Design Review Permit (DRP)
  • Design Review Permit for Residential Subdivision (DRRS)
  • Design Review Permit Modification (DRP MOD)
  • Development Agreement (DA)
  • Downtown Nightclub Zoning Clearance
  • Downtown Pedestrian Zone Improvement Zoning Clearance
  • Downtown Residential to Commercial Conversion Zoning Clearance
  • Easement Abandonment
  • Farmers Market (FARM)
  • Flood Encroachment Permit (FEP)
  • Grading Plan (GP)
  • Lot Line Adjustment (LLA) or Voluntary Merger (VM)
  • Major Project Permit (MPP)
  • Ministerial Ten Lot Map Checklist
  • Ministerial Two Lot Map Checklist
  • Minor Design Review Permit (MDRP)
  • Noise Ordinance Exception
  • Permit Extension (EXT)
  • Planned Development (PD)
  • Planned Sign Permit Program (PSPP)
  • Reasonable Accommodation
  • Rezone (RZ) General Plan (GPA) or Specific Plan Amendment (SPA)
  • Sign Exception
  • Telecommunications Facilities
  • Temporary Commercial Events
  • Tentative Parcel Map (PM) or Map Modification
  • Tentative Subdivision Map (SUBD)
  • Tree Permit (TP)
  • Variance (V)
  • Fee Schedule effective July 1, 2025
  • Administrative Tree Summary
  • Agreement for Full Cost Billing
  • Appeal Form
  • Deed Restriction for JADU
  • Electronic Signature Disclosure
  • Home Occupation Clearance Form
  • Ministerial Ten Lot Affidavit
  • Ministerial Two Lot Affidavit
  • Minor Design Review Permit Notice
  • Parking Study Form
  • Property Owner Affidavit
  • Statement of Design Intent
  • A Frame Sign Criteria Flyer
  • Accessory Dwelling Unit Requirements
  • Accessory Dwelling Units Multi Family
  • Accessory Dwelling Units Single Family
  • Accessory Structures
  • Development Decoded Brochure
  • Digital File Formats for Map, Text, Graphics and Figures
  • Downtown Building Additions and New Construction
  • Downtown Façade Improvements
  • Downtown Nightclubs
  • Downtown Pedestrian Zone Improvements
  • Downtown Pre Design Projects
  • Downtown Residential to Commercial Conversion
  • Entitlement Permit Review Process
  • Fence Handout
  • Housing Spectrum Handout
  • No Grade Lots
  • Objective Design Standards HDR
  • Objective Design Standards MDR
  • Objective Design Standards
  • Plan Detail Requirements
  • Roof Equipment Screening
  • SB 684 Requirements
  • SB 9 Requirements
  • Signs in Roseville

Engineering

0 found in 0 section(s)
  • Civil Improvement Plan Review Permit Application Form
  • Electronic Signature Disclosure
  • Encroachment Application
  • Insurance Requirements for Encroachment Permits
  • Map Review Application Form
  • Processing Grant of Easement Application
  • Street Name Application
  • Encroachment Checklist
  • Improvement Checklist
  • Lot Line Adjustment Voluntary Merger Checklist
  • Map Checklist
  • Improvement Parks Projects Checklist
  • Engineering Division Development Fees
  • Trench Cut Fees
  • Concurrent Review Form
  • HEC 1 Studies Submittal Requirements
  • HEC 2 or HEC RAS Studies Submittal Requirements
  • Lot Line Adjustment Owner Consent Form
  • Post Construction Storm Water Quality Plan Template
  • SWQ Bio Retention Checklist
  • SWQ Cartridge Catch Basin Checklist
  • SWQ Filter Device Checklist
  • SWQ Hydro Separator Checklist
  • SWQ Infiltration Basin Checklist
  • SWQ Infiltration Trench Checklist
  • SWQ Permit Renewal Form 2019
  • SWQ Sand Oil Separator Checklist
  • SWQ Stormwater Planter Checklist
  • SWQ Vegetation Swale Checklist
  • Dumpster and Pod Policy
  • Specifications for the Digital Submission of Utility Composites

Code Enforcement

0 found in 0 section(s)
  • Complaint Form
  • Code Compliance Brochure
  • Construction Noise Regulation
  • Non Profit Clean Up Assistance
  • Nuisance Handout
  • Parking Ordinance Fact Sheet
  • Rat Infestation Handout
  • Sign Brochure
  • West Nile Virus Brochure
  • Fine Schedule